Excellent supervision and workshop on oil, gas and petrochemical transmission lines

  • Construction of "14 Rafsanjan / Kerman" and 16 Rafsanjan / Isfahan Pipelines
  • Redirection of Maroon / Isfahan Oil and Gas Pipelines in Karun 3 "30 Oil and 8 Gas Dam Area in Saab-e-Abor Mountains Area and Crossing Karun River and Bridge Overpass
  • Caspian Sea Crude Oil Transmission and Processing Plan Construction of a 32-inch 140-km Sari-Veresk-Nimrod Pipeline
  • Replacement of Ahwaz / Tang technical pipeline in section "D" "30
  • Redirection of pipelines in the Marouk Dam area "26 and 16"
  • Transmission and Processing of Crude Oil in Caspian Sea Countries - Construction of Neka "30 & 32" Pipeline - Sari
  • Redirection of Ray / Tabriz Oil and Gas Pipelines at Basement / Tabriz Intermediates "16 & 24"
  • Construction of 4 pipelines from Abadan refinery to Iran Gas 30, 26, 16 and 12
  • Construction of pump house and feed line for LAB return to Kermanshah Torch Petrochemical Complex
  • Construction of "20 and 24" West Ethylene Transmission Pipelines Parts 1, 2, 3, 5 and 10
  • Workshop Supervision Services of Mahshahr Export Port Organization and Abadan Mahshahr Pipeline Design and Related Facilities
  • Redirection of "30 and Gas" Oil Pipelines 8 to Karun 4 Dam Area by E.P.C in Saeb-Abor Mountains Area and Passing Under Karun 4 Lake
  • Technical Supervision and Inspection Services of the Property / Wheat Garden Pipeline
  • Tehran / Tabriz 16-inch Line Monitoring and Technical Services

Excellent supervision and architectural workshop

  • Supervision of Implementation of Residential and Public Construction Complex of Maroon Pipeline House No. 5 - Isfahan
  • Supervision of the Construction of Residential and General Construction Complex of Maroon Pipeline House No. 2 - Isfahan